Missed Deadlines
Late shop drawings cascade into field delays, labor overruns, and costly schedule compression.

Quality Assurance & Delivery Process
Step-by-step breakdown of how a project moves through Steelweb.
Stage 01
Client layout drawings and project requirements are received and reviewed. Project scope, specifications, standards, schedules, and coordination requirements are established before modeling begins.
Stage 02
SteelWeb develops the 3D BIM model and detailing package. The model is internally checked for design accuracy, constructability, clash detection, and compliance with client standards and fabrication requirements.
Stage 03
Drawings and BIM models are submitted for approval and coordination. SteelWeb works closely with architectural, structural, mechanical, civil, and piping disciplines to resolve conflicts and ensure full project integration.
Stage 04
Final fabrication and erection drawings are produced after approval. Our Quality Control team performs a final review to verify accuracy, completeness, and fabrication readiness before release to production and erection.
Late shop drawings cascade into field delays, labor overruns, and costly schedule compression.
Inaccurate detailing creates RFIs, re-work, and strained relationships between fabricators and EORs.
In-house teams get bottlenecked. Peak demand overwhelms internal detailing resources fast.
Disconnected documentation creates clashes and costly surprises during erection.
SteelWeb utilizes advanced BIM coordination and 3D modeling workflows to identify clashes, improve multidisciplinary coordination, and support seamless project execution.
Our digital construction approach enhances constructability, reduces RFIs, and improves coordination between engineers, fabricators, contractors, and project stakeholders.
Our teams collaborate early in the project lifecycle to improve constructability, reduce conflicts, and accelerate execution.